OWNER:
DTE
GENERAL CONTRACTOR: DTE
Contact:
John Decator
PILING CONTRACTOR:
Faust Corporation
Contact:
Marc Faust
586) 445-2030
CONTRACT DETAILS
Contract Duration:
4 Months
Scope of Work:
Remove Old Retaining Walls
Install New Retaining Walls
Install Walkways
PROJECT OVERVIEW:
Faust
Corporation removed existing sheet pile retaining walls from around two ash
settling ponds and replaced the old piling with 42,000 square feet of new
sheet piling. Additionally Faust constructed an equalization canal between
the two ponds and constructed a walkway across the canal.
The project also called for the installation of a new walkway/bridge
across the settling ponds and the installation of
guardrails.